Change of use comes first
Every building has a use class. Moving between classes sometimes needs a full
application, and sometimes runs through a lighter prior approval route instead.
Two of those routes matter around here. One allows suitable agricultural buildings to
become dwellings. The other allows certain commercial premises to become homes. Both
carry conditions on size, condition, how long the building has been vacant, and where it
stands.
Those conditions get revised every few years, which is why no figures are published
here. The only useful answer is one checked against the current rules for your specific
building on the day you ask.
How the planning routes work.
bMAC Studio is led by a registered architect. The word is protected by law, and
the ARB holds the register that decides who may use it.
What the existing building will not do
The second question is whether the thing standing there can carry a conversion at all.
They fail on the same handful of points.
- Foundations. Garages and outbuildings were often built on far less
than a house needs.
- Damp. Many older structures have no damp proof course, and a floor
slab laid without one cannot simply be carpeted over.
- Floor level. Garage slabs usually sit below the house, so the new
floor build-up eats head height you may not have.
- Thermal performance. Walls built as a shed have to reach habitable
standards, and the insulation has to go somewhere.
None of these
is fatal. All are
cheaper to find in
a survey than in
a quote.
What building control expects
A conversion is judged as a new dwelling in most respects: insulation, ventilation,
escape windows, sound between dwellings where a building is split, and drainage that
reaches somewhere legal. Existing walls and roofs usually need work to get there.
This is where detailed drawings pay for themselves, because a converted building has
almost no standard details in it. Every junction is a decision.
See what that looks like across 37 sheets.